混凝土攪拌車是如何卸料的?
來源:http://www.wtiqradio.com發布日期:2020-06-23   瀏覽量:
 
其實一般卸料慢的大部分都是小型攪拌車,那只是因為它放量小才卸料慢嗎?當然不是,攪拌車卸料慢跟液壓泵和液壓馬達有關,一般小型攪拌車的液壓馬達都是定量齒輪泵,它的工作速度不怎么快,就是加油門也不會有明顯改善,而且還不能長時間的加大油門會燒壞齒輪油泵。還有一種攪拌車的液壓泵是柱塞式變量泵,這種攪拌車在運輸過程中一般速度較慢,但在卸料時,轉速快,出料快。開混凝土攪拌車該注意什么?有些什么開攪拌車的經驗?經常會有人詢問,不少熱心的車友也給了不少好的回答建議,不過都比較的分散,那么接下來就為大家詳細的列上幾條,供大家參考。
In fact, most of the slow unloading is due to small-scale mixer. Is that because of its small volume? Of course, the slow unloading is related to the hydraulic pump and hydraulic motor. Generally, the hydraulic motor of small-scale mixer is quantitative gear pump. Its working speed is not so fast, and even the fuel valve will not be significantly improved, and the accelerator will burn for a long time The gear oil pump is broken. There is also a kind of hydraulic pump of the mixer truck, which is a plunger type variable pump. The speed of the mixer truck is generally slow in the transportation process, but when unloading, the speed is fast, and the discharge is fast. What should I pay attention to when driving a concrete mixer? What's my experience in driving a mixer? I'm often asked. Many enthusiastic car drivers also give me many good answers and suggestions, but they are all scattered. Then I'll give you a detailed list of them for your reference.
為了提高水泥的運輸效率,減少袋裝水泥造成的資源浪費,目前絕大多數水泥都采用散裝水泥罐車運輸,因水泥罐車都采用氣力輸送卸料,卸料速度和卸料剩余率是考核水泥罐車卸料效率的重要指標。如何保證罐內水泥盡量卸完、卸盡,采用正確的方法非常重要。因卸料過程中罐內水泥無法肉眼直觀看到,必須借助一些方法才能辨別水泥卸料情況,下面給大家介紹幾種簡易判別水泥是否卸完的方法:
In order to improve the transport efficiency of cement and reduce the waste of resources caused by bagged cement, most of the cement is transported by bulk cement tankers at present, because the cement tankers are transported and unloaded by pneumatic means, and the unloading speed and the residual rate of unloading are important indicators to assess the unloading efficiency of the cement tankers. It is very important to adopt correct methods to ensure that the cement in the tank is discharged as much as possible. Because the cement in the tank cannot be seen directly by the naked eye during the unloading process, some methods must be used to identify the unloading situation of cement. Here are some simple methods to determine whether the cement has been unloaded:
壓力表檢查法,散裝水泥罐車在卸料時,罐內空氣壓力為1.8~2.4公斤/平方厘米,卸料快結束時,氣壓快速下降,如果壓力表降到0~0.2公斤/平方厘米之間,則證明罐內水泥基本卸完。
Pressure gauge inspection method: when the bulk cement tank truck is unloading, the air pressure in the tank is 1.8-2.4 kg / cm2, and when the unloading is finished, the air pressure drops rapidly. If the pressure gauge drops to 0-0.2 kg / cm2, it proves that the cement in the tank is basically unloaded.
卸料時間判別法,正常水泥罐卸料速度一般為每分種1~1.2噸,如果水泥裝載重量為32噸,則一般需要半小時左右卸完,所以可以根據卸料噸位計算卸料時間,這樣前25分鐘操作人員比較輕松,沒有必要長時間緊盯壓力表或通過其它方法檢查是否卸完。
According to the judgment method of unloading time, the unloading speed of normal cement tank is generally 1-1.2 tons per minute. If the loading weight of cement is 32 tons, it usually takes about half an hour to unload. Therefore, the unloading time can be calculated according to the unloading tonnage. In this way, the operators in the first 25 minutes are relatively easy. It is not necessary to stare at the pressure gauge for a long time or check whether the unloading is completed by other methods.
空壓機聲音辨別法,正常卸料時空壓機負載大,空壓機工作時發出的聲音比較沉悶,罐體卸料結束時,空壓機負載變小,工作聲音變得清脆。
Air compressor sound identification method: the load of the air compressor is large in normal unloading time and space, and the sound produced by the air compressor during operation is relatively dull. At the end of tank unloading, the load of the air compressor becomes smaller and the working sound becomes crisp.
敲打罐體法,水泥卸料過程中,可以用手敲打罐體,如果聲音沒有回音,則證明罐體內水泥余料較多,還要卸一段時間;如果罐體有回音,證明罐體內水泥快卸完了。
In the process of cement unloading, the tank can be knocked by hand. If there is no echo in the sound, it is proved that there is a lot of cement surplus in the tank and it needs to be unloaded for a period of time; if there is echo in the tank, it is proved that the cement in the tank is almost discharged.
卸料軟管觀察法,正常卸料時,卸料軟管受流化水泥沖擊,軟管不斷抖動,如果軟管不再抖動,也可證明罐內水泥基本卸完。
Observation method of unloading hose: during normal unloading, the unloading hose is impacted by fluidized cement, and the hose keeps shaking. If the hose does not shake, it can also prove that the cement in the tank is basically discharged.
水泥接收塔頂揚灰辨別法,正常卸料時,水泥消耗的氣量相對較少,“料多氣少”,接收塔頂揚灰較少,卸料后期“料少氣多”,接收塔頂揚灰增多。
According to the identification method of lifting ash on the top of the cement receiving tower, during normal unloading, the gas consumption of cement is relatively small, "more material and less gas", less lifting ash on the top of the receiving tower, and "less material and more gas" at the later stage of unloading, more lifting ash on the top of the receiving tower.
當空壓機加壓過程中因其他原因而停止空壓機工作時,應關閉前后倉的近期球閥,然后把外接氣源打開,過一會再關閉外接氣源,打開前后倉的進氣球閥。
When the air compressor stops working due to other reasons in the process of pressurization, the short-term ball valve of the front and rear silos shall be closed, then the external air source shall be opened, and then the external air source shall be closed later, and the air inlet valve of the front and rear silos shall be opened.
通過以上方法中的一種或二種就可簡單的辨別水泥是否卸完,各類水泥罐車由于結構不同、選用空壓機不同、水泥接收塔的高度不同,以及所裝水泥的比重不同,在卸料速度和剩余率也會有所不同,司機可通過記錄實際操作方法和卸料時間,不斷總結經驗,獲得的操作方法,達到的卸料效率。
One or two of the above methods can be used to simply identify whether the cement has been unloaded. Due to different structures, different air compressors, different height of cement receiving tower, and different proportion of cement loaded, the unloading speed and residual rate will be different. The driver can record the actual operation method and unloading time, and constantly summarize experience to obtain the most Good operation method to achieve the highest discharge efficiency.
?